| Published Date |
Last Date of Sale |
Last Date of
Receipt |
Tender No. |
Subject |
|
10.01.2012 |
29.01.2012 |
02.02.2012 14:30 hrs. |
HWPT/INST/232/2011/02 Estimated Cost:
75,004/- |
Comprehensive Annual Maintenance Contract for LG make, model
Aria-1000, Electronic Telephone Exchange of HWP (Tuticorin). |
|
16.01.2012 |
27.01.2012 |
30.01.2012 14:30 hrs. |
HWPK/Mech/2011/06 Estimated Cost:
66,600/- |
Servicing and Load Testing of Chain Pulley Blocks, Fork Lifts,
Jib Crane, E O T & Mobile Cranes at HWPK Site. |
|
31.10.2011 |
-- |
30.12.2011
(Extended - please see
amendment) |
Notice inviting
"Expression of Interest"
Last date for submission
extended upto 30th January 2012. |
For and on behalf of President of India,
Associate Director (R&D, S&SE), HWB, Department of Atomic Energy
(DAE), Government of India invites "Global Expression of
Interest (EoI)" from Agencies of International repute for
providing Global Sales Representative Service to the Department
of Atomic Energy, Government of India for export of Heavy Water
to various countries. |
|
06.01.2012 |
25.01.2012 |
27.01.2012 14:00 hrs. |
DPS/HWP/B/269/ST/6370 |
Disposal of scrap items of different group. |
|
23.12.2011 |
10.01.2012 |
18.01.2012 15:00 hrs
Date of Pre-Bid meeting: 12.01.2012 |
HWB/TDP/ERCA/E&I/11/01 Estimated Cost:
50 Lakh |
Supply, Erection and Commissioning of Electrical and
Instrumentation Items for ERCA set up at TDP, RCF, Chembur,
Mumbai. |
|
02.01.2012 |
13.01.2012 |
17.01.2012 14:30 hrs. |
HWP(K)/CIVIL/P-03/21/2011 Estimated Cost:
10,73,000/- |
Water proofing of roof terraces with polymer based water
proofing treatment for Plant Buildings at Heavy Water Plant
(Kota) Anushakti for the year 2011-12. |
|
08.12.2011 |
13.01.2012 |
17.01.2012 15:00 hrs. |
HWPK/PROD/DISPOSAL/1/2011 |
SALE OF SODIUM SULPHATE (GLAUBER SALT), ON AS IS WHERE IS BASIS,
APPROXIMATE QUANTITY - 600 MT". |
|
27.12.2011 |
09.01.2012 |
12.01.2012 15:00 hrs. |
HWPK/Mech-ISI/2011-01 Estimated Cost:
2,26,000/- |
Shot blasting of H2S storage tank nos. 3814TK-8/9/10/11 for
surface cleaning from inside of the tanks. |
|
14.12.2011 |
31.12.2011 |
05.01.2012 14:30 hrs. |
HWP/CIVIL/COLONY/13/2011 Estimated Cost:
7,08,800/- |
House keeping of the vacant areas and
staircase areas of residential blocks at HWP(T) colony for the
year 2012-13. |
|
12.12.2011 |
31.12.2011 |
04.01.2012 15:00 hrs. |
HWPK/Mech/Vwire-Screen/2011 Estimated Cost:
5,40,000/- |
Fabrication, testing and supply of SS 304 Vee Wire Screen
Element with flange for the 12" NB Rubber Lined Resin Trap in
the outlet of Cation and Anion beds of Water Treatment Plant. |
|
07.12.2011 |
03.01.2012 |
04.01.2012 14:00 hrs. |
HWPM/I-P/COMP/2011/655
Estimated Cost:
8,00,000/- |
Annual Maintenance Contract for Computers, Printers & LAN. |
|
16.12.2011 |
28.12.2011 |
02.01.2012 14:30 hrs. |
HWPK/MECH/05 Estimated Cost:
2,10,600/- |
Maintenance & Testing of Safety Relief Valves at HWPK Site. |
|
14.12.2011 |
24.12.2011 |
27.12.2011 15:00 hrs. |
HWPK/INST/2011 Estimated Cost:
1,00,000/- |
Comprehensive Annual
Maintenance Contract for Tata make Telephone Exchange Model
IDX-1250 with built in capacity of 450 lines including tie
lines. |
|
05.12.2011 |
20.12.2011 |
26.12.2011 15:00 hrs. |
HWPK/PROD/5/2011 Estimated Cost:
3,60,740/- |
Operation and Routine Maintenance of Sewage Treatment Plant and
Cleaning / Parking of Solar Discs of Solar Steam Generation
Plant. |
|
02.11.2011 |
05.12.2011
Extended upto
20.12.2011 |
09.12.2011 14:30 hrs.
Extended upto
24.12.2011 14:30hrs. |
HWPK/TSS/2011/01 Estimated Cost:
74,826/- Click to see
Corrigendum: HWPK/TSS/2011/01/543 |
Witnessing the Statutory Testing of Safety
Relief Valves and Storage Tanks as per SMPV (U) Rule-18 & 19 at
HWPK Site. |
|
07.12.2011 |
19.12.2011 |
20.12.2011 14:30 hrs. |
HWP/B/21/11-12/TS-136/ETP Estimated Cost:
3,61,000/- |
CPVC Piping Work for Effluent Treatment Plant (ETP). |
|
21.11.2011 |
13.12.2011 |
17.12.2011 15:00 hrs. |
HWPK/I&C/WCMS/2011/01 Estimated Cost:
8,25,000/- |
Supply, Implementation, Support, Maintenance and Training of
Works Contract Management System (WCMS) package based on CPWD
guidelines at HWP(K). |
|
08.11.2011 |
30.11.2011 |
05.12.2011 15:00 hrs. |
HWPK/PROD/4/2011 Estimated Cost:
16,16,200/- |
Operation work of Shifting of cylinders,
cooling tower cells cleaning, chemical dissolution & drums
handling, sodium sulphide dissolution, digging and shifting of
sodium sulphate (Glauber Salt) in tanks and Cleaning of
Neutralization Pit in WTP at Heavy Water Plant (Kota). |
|
02.11.2011 |
25.11.2011 |
05.12.2011 15:00 hrs. |
HWPK/CIVIL/P-9/17-2/2011 Estimated Cost:
30.00 Lakh |
Construction of Pre-Engineered Building for
product storage at Heavy Water Plant, Kota, Rajasthan. |
|
08.11.2011 |
Tender has been cancelled.
click to see corrigendum. |
HWPK/I&C/BI-WEB/2011/01 Estimated Cost:
1,10,000/- |
Development, Deployment and Documentation of Interactive
Bilingual Intranet Website at HWP(K). |
|
04.10.2011 |
02.11.2011 |
21.11.2011 14:30 hrs. |
HWPK/INST/2011 Estimated Cost:
90,00,000/- |
Design, Engineering, Estimation, Supply, Installation, Testing,
Commissioning and Guaranty of IP based CCTV System at HWPK Site. |
|
31.10.2011 |
14.11.2011 |
15.11.2011 14:30 hrs. |
DPS/KRSU/29/PT-02/2011 |
|
|
13.10.2011 |
04.11.2011 |
10.11.2011 14:30 hrs. |
HWP/TAL/MECH/2011/07 Estimated Cost:
8.00 Lakhs. |
Maintenance of Machines and Equipments in existing facilities
for Production of Solvents. |
|
18.10.2011 |
04.11.2011 |
08.11.2011 14:30 hrs. |
HWPK/MECH/SCAFF/2011-12 Estimated Cost:
16,93,500/- |
Annual Rate Contract for Preparation and Removal of Scaffoldings
and supply of Semi Skilled Manpower for the job of Material
Handling, Cleaning of Components etc. for day-to-day Maintenance at HWPK Site. |
|
11.10.2011 |
29.10.2011 |
03.11.2011 14:30 hrs. |
HWPK/Mech/Piping/2011-05 Estimated Cost:
12,31,200/- |
Supply of Structural Steel, Removal, Fabrication, Welding,
Erection and Replacement of Roof Plate, inside Roof Structure of
Sodium Sulphate bulk Storage Tank (3815 TK-15) at HWPK Site. |
|
13.10.2011 |
29.10.2011 |
02.11.2011 14:30 hrs. |
HWP(K)/Civil/P-09/17-1/2011 Estimated Cost:
51,90,000/- |
Civil and Structural works for Product Tank
Storage Building at HWP (Kota): Part-I |
|
30.09.2011 |
17.10.2011 |
20.10.2011 15:00 hrs. |
HWPK/Mech/Foot Valve/2011 Estimated Cost:
1,75,000/- |
Under Water job of Removal and Installation of 14" NB Flanged
End, 150# Foot Valves in filter water wet well at HWP(K). |
|
26.09.2011 |
03.10.2011 |
07.10.2011 15:00 hrs. |
HWP(K)/CIVIL/C-05/08/2011 Estimated Cost:
12,90,000/- |
Miscellaneous Civil Maintenance / Renovation
works at HWP (K) Housing Colony for the year 2011-12. |
|
12.09.2011 |
27.09.2011 |
01.10.2011 15:00 hrs. |
HWPK/ADMN/TC/22/2011
Part A:
Estimated Cost:
39,20,400/-
Part B:
Estimated Cost:
27,21,600/- |
Part A: Supply and plying of two numbers of Tata Sumo/ Mahindra Bolero/ Chevorlet
Tavera Vehicles (Seating Capacity 8+1) BS-IV compliant in show
room condition for a period of three years on contract basis.
Part B: Supply and plying of two numbers of Tata Indica Vista
Cars (Seating Capacity 4+1) BS-IV compliant in show room
condition for a period of three years on contract basis. |
|
08.09.2011 |
24.09.2011 |
30.09.2011 14:30 hrs. |
HWP/TAL/CIVIL/2011/16 Estimated Cost: 52.25
lakhs. |
Construction of Underground Water Reservoir of capacity 800 CUM
in the Housing Colony at HWP, Talcher. |
|
15.09.2011 |
24.09.2011 |
28.09.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/G |
01. HWPM/M-P/102/MTA-2011/08 - Piping fabrication & Erection
works in connection with various modification jobs during
MTA-2011. 02. HWPM/M-P/102/MTA-2011/27 - Ultrasonic Flaw
Detection (UFD) & Liquid Penetrant Test (LPT), Wet Fluorescent
Magnetic Particle Test of weld joints and Hardness Measurement
work during MTA-2011.
03. HWPM/E-P/MTA-11/TR/O-H/NIT/2011 - Overhauling of Power
Transformers (03 Nos.) & Distribution Transformers (10 Nos.)
work during MTA-2011 at HWP (M). |
|
26.08.2011 |
13.09.2011 |
16.09.2011 16:00 hrs. |
|
Appointment of Licensees for the
Implementation of Ammonia Flue Gas Conditioning System, developed
and patented by Heavy Water Board. |
|
23.08.2011 |
13.09.2011 |
17.09.2011 14:30 hrs. |
HWPK/Mech/2011/04 Estimated Cost: 22,41,000/- |
Annual rate contract for repair & maintenance
of insulation work on Towers, Tanks, Exchangers and Piping etc.
at HWP (K) Site. |
|
25.07.2011 |
13.09.2011 |
16.09.2011 14:30 hrs. |
HWPK/Mech-Valve/2011-01 Estimated Cost: 14,53,500/- |
Maintenance & Testing
of double discs & wedge type gate valves & utility valves at HWP(K)
Site. |
|
24.08.2011 |
09.09.2011 |
14.09.2011 14:30 hrs. |
HWPK/I&C/PCAMC/2011/01 Estimated Cost: 6,28,000/- |
Annual Maintenance Contract for Servicing /
Maintenance of Computer System Alongwith Peripherals Installed
at HWP (K). |
|
19.08.2011 |
27.08.2011 |
30.08.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/D-2 |
01. Complete overhauling including seal
inspection, suction & discharge spools replacement work of H2S
gas boosters during MTA-2011 at HWP(M). 02.
Maintenance & Testing of DD/Gate/Check Valves of sizes from 16"NB to
36"NB during MTA-2011 at HWP(M). |
|
19.08.2011 |
27.08.2011 |
30.08.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/D-1 |
01. Flange joints maintenance during MTA-2011
at HWP(M). 02. Servicing and testing of Safety
Valves during MTA-2011 at HWP(M). 03.
Servicing and testing of Plug Valves during MTA-2011 at HWP(M).
04. Eddy Current Testing of Shell & Tube type Heat Exchangers
during MTA-2011 at HWP(M). 05. Overhauling of
6.6 KV and 33 KV MOCB's at HWP(M). 06. SDV
Actuator maintenance during MTA-2011. 07.
Maintenance of Control Valves during MTA-2011. |
|
05.08.2011 |
01.09.2011 |
07.09.2011 14:30 hrs. |
HWP/TAL/CIVIL/2011/14 Estimated Cost: 14.92
Lakhs |
External Painting of
Plant and Office Buildings at Heavy Water Plant, Talcher. |
|
25.07.2011 |
27.08.2011 |
30.08.2011 14:30 hrs. |
HWPK/Mech/Piping/2011-03 Estimated Cost: 13,96,440/- |
Fabrication, Welding &
Erection of Pipe Lines at HWP(K). |
|
18.08.2011 |
26.08.2011 |
29.08.2011 14:30 hrs. |
HWP(K)/CIVIL/P-08/10/2011 Estimated Cost: 10,70,000/- |
Renovation of toilets
at HWPK in year 2011. |
|
04.08.2011 |
24.08.2011 |
27.08.2011 15:00 hrs |
HWPK/ELECT/FB/2011 Estimated Cost: 2,35,224/- |
Repair / replacement
of fire barriers installed at cables entry in different substations
/ buildings of HWPK Site. |
|
21.07.2011 |
13.08.2011 |
18.08.2011 14:00 hrs. |
HWPT/MECH/649 Estimated Cost: 13,02,200/- |
Supply, erection and
commissioning of mechanical packages for Effluent Treatment Plant
for Versatile Solvent Synthesis Pilot Plant. |
|
02.08.2011 |
06.08.2011 |
12.08.2011 14:30 hrs. |
HWP:TAL:MAINT(E):2011:09 |
Jointing of 11 kV 150
sq.mm. unearthed XLPE cable laid for Colony Power Supply. |
|
04.07.2011 |
22.07.2011 |
12.08.2011 15:00 hrs. |
HWB/PE/O-18/P-I/01
Estimated Cost: 570 Lakh |
Engineering,
procurement, construction (EPC) involving process, mechanical,
civil, electrical and instrumentation work, complete project
management and execution, consisting of plant building, complete
civil / structural works, supply and erection of O18 water
production facility consisting of integration of water distillation
cascade with associated systems / equipments, utility facilities
along with associated piping, electrical and instrumentation,
auxiliary systems, erection of free issue material, commissioning
and performance testing of the complete plant at Heavy Water Plant,
Manuguru (AP). |
|
15.07.2011 |
27.07.2011 |
03.08.2011 14:00 hrs. |
HWPM/DGMP/M-P/30001/CT/15/2011 Estimated Cost: 59.34 Lakhs |
Complete revamping of
Cooling Tower Cells (2 Nos.) at Heavy Water Plant (Manuguru). |
|
08.07.2011 |
27.07.2011 |
03.08.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/C |
01. Re-routing &
Laying of CW return
header on Ground floor for Main Cooling Tower at Main Plant of
HWP (M). 02. Gate Valve / Globe Valve / Non-return Valve
/ Butterfly Valve dropping & re-erection during MTA-2011 in Main
Plant of HWP (M).
03. Removal Existing damaged hot insulation,
fixing of hot insulation on piping, vessels and Heat Exchanger
including painting in Main Plant of HWP (M) during MTA-2011. |
|
04.07.2011 |
16.07.2011 |
27.07.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/B |
Maintenance & Testing
of DD/Gate/Check Valves at HWP(Manuguru). |
|
15.07.2011 |
22.07.2011 |
26.07.2011 14:30 hrs. |
HWP(K)/CIVIL/P-08/12/2011 Estimated Cost: 11,60,000/- |
Epoxy and Chlorinated
Rubber Painting of Sodium Sulphate Solar Evaporation Tanks, VDS
(M.S.) and Epoxy Painting on Booster Foundation (R.C.C) in the year
2011-2012 at HWPK. |
|
14.07.2011 |
22.07.2011 |
26.07.2011 14:30 hrs. |
HWPK/Mech/Piping/2011/04 Estimated Cost: 1,41,531/- |
Cold insulation on
equipments for HEWAC facility at HWPK Site. |
| 24.06.2011 |
15.07.2011 |
25.07.2011 15:00 hrs. |
HWB/MECH/SA/ATA/2011
Estimated Cost: 2,75,000/- |
Salvaging of service aged Inconel 625 and
Stainless Steel cracker components by resolution annealing heat treatment and machining of
the same |
| 30.06.2011 |
19.07.2011 |
22.07.2011 14:30 hrs. |
HWPK/Mech/2011/03
Estimated Cost: 1,44,000/- |
Rectification of damaged components of sieve
tray of XU Towers at HWP(K) Site. |
| 27.06.2011 |
13.07.2011 |
16.07.2011 14:30 hrs. |
HWPK/Mech/OLS/2011
Estimated Cost: 1,67,000/- |
Annual rate contract for on line sealing
jobs of steam leakage at HWPK Site. |
| 01.07.2011 |
08.07.2011 |
11.07.2011 14:30 hrs. |
HWP(K)/CIVIL/P-7/14/2011
Estimated Cost: 15,50,000/- |
Day to Day Maintenance of Industrial Open
Area, Roads, Drains etc. in HWP(K) at Anushakti for the year 2011-12. |
| 01.06.2011 |
24.06.2011 |
06.07.2011 14:00 hrs. |
HWPM/M-P/102/MTA-2011/01
Estimated Cost: 63.00 Lakhs |
Heat Exchangers Maintenance and Testing work
during MTA-2011 in HWP(M). |
| 07.06.2011 |
22.06.2011 |
24.06.2011 14:30 hrs. |
HWPK/Mech/DDdisc/2011
Estimated Cost: 14,81,000/-
|
Repair of discs of
double disc gate valves of HWP, Kota. |
| 29.04.2011 |
06.06.2011 |
20.06.2011 15:00 hrs |
HWB/MECH/SA/2011
|
Salvaging of
service aged Inconel 625 and stainless steel cracker
components by resolution annealing heat treatment and
involving other manufacturing & fabrication activities. |
| 09.05.2011 |
26.05.2011 16:00 hrs. |
17.06.2011 15:00 hrs. |
HWB/UOF/K/02 Estimated
Cost: 22 Crores. |
Engineering,
procurement, construction (EPC) of Denitration plant consisting
of Denitration columns, pre-heaters, cyclone separators, scrubbers, induction heaters,
evaporators, condensers various vessels, pumps along with the associated piping,
electrical and instrumentation, commissioning and performance testing at Kalpakkam, Tamil
Nadu. |
| 27.05.2011 |
10.06.2011 |
14.06.2011 14:30 hrs. |
HWP(K)/CIVIL/C-05/04/2011
Estimated Cost: 21,00,000/-
|
Carpentry, Plumbing,
Masonry, Welding & Store handling jobs in HWP(K) Housing
Colony for the year 2011-12. |
| 27.05.2011 |
10.06.2011 |
14.06.2011 14:30 hrs. |
HWPK/I&C/LAN/2011/01
Estimated Cost: 4,37,950/-
|
Supply, Installation
& Testing of Ethernet Network Components at HWP(K). |
| 19.05.2011 |
03.06.2011 |
07.06.2011 15:00 hrs. |
HWPK/ELECT/COLONY/03/2011
Estimated Cost: 21,84,100/-
|
Supply, installation,
testing and guarantee of exhaust fans, ceiling fans and point
wiring in various type of residential quarters at HWP(K) Colony. |
| 02.05.2011 |
23.05.2011 |
26.05.2011 1430 hrs |
HWPK/Mech/Piping/2011/02
|
Fabrication,
welding & erection of pipelines for replacement of buried
drain header in H2S area & other pipelines in DU at HWPK
Site. |
| 26.04.2011 |
19.05.2011 |
25.05.2011 1400 hrs |
HWPM/M-P/CT/46/2010
|
Revamping of
Cooling tower at ETP of Main Plant during Major Turn Around
period in Heavy Water Plant (Manuguru) including supply of
required materials. |
| 25.04.2011 |
23.05.2011 |
25.05.2011 1400 hrs |
HWPM/E-P/VFD/MISC/NIT/2011
|
Miscellaneous
Electrical works like Excavation, HT and LT Cable removal,
re-routing, laying & termination and other associated
works for incorporation of VFDs in Main Plant. |
| 10.5.2011 |
19.05.2011 |
23.05.2011 14:30 hrs. |
HWP(K)/CIVIL/C-02/03/2011 |
Upkeeping
and Miscellaneous Works in HWP(K) Housing Colony for the year 2011-2012 |
| 04.05.2011 |
19.05.2011 |
23.05.2011 1430 hrs |
HWPK/ELECT/TENDER/ TF-OIL/2011
|
Maintenance of
transformers and filtration of transformer oil at HWP, Kota. |
| 10.04.2011 |
18.05.2011 |
21.05.2011 1430 hrs |
HWPK/Mech/2011/02
|
Removal of hot
Insulation from LSHS tank at HWP (K) Site. |
| 30.03.2011 |
03.05.2011 |
19.05.2011 1430 hrs |
HWPK/INST/2011/T-11
|
Design,
Engineering, Supply, Erection, Commissioning & Testing of
Level Monitoring System for LPG bullets at HWP (K). |
| 10.05.2011 |
13.05.2011 |
16.05.2011 14:30 Hrs. |
HWP(K)/CIVIL/P-06/07/2011 Estimated
Cost: Rs.15,00,000/- |
Annual
maintenance of lawns and gardens at HWPK Anushakti for the year 2011-2012 |
| 13.04.2011 |
30.04.2011 |
02.05.2011 1430 hrs |
HWPK/TSS/ISO/2011/01
|
Recertification
and Audit Services for Quality Management System-ISO 9001:2008
and Environmental Management System- ISO 14001:2004 for and at
Heavy Water Plant (Kota) and acquiring recertification
thereof. |
| 09.03.2011 |
25.04.2011 |
29.04.2011 1400 hrs |
HWPT/MECH/625 |
Revamping of
Cooling Tower at HWPT. |
| 30.03.2011 |
19.04.2011 |
23.04.2011 1500 hrs |
HWPK/ELECT/CABLE/2011
|
Supply and
Installation of Power Cable from Sub Station-C to Outer
Barrier of HWPK. |
| 09.03.2011 |
14.03.2011 Extended
upto 25.03.2011
Extended upto 12.04.2011
|
16.03.2011 Extended
upto 30.03.2011 1430 hrs Extended upto 15.04.2011 1430 hrs
|
HWPK/Mech/WTP/2011
Click to see
Corrigendum-1 Click to see
Corrigendum-2
|
Supply of spares
and maintenance of 36 m Dia x 2.9 m SWD clariflocculator at
water treatment plant of HWPK. |
| 07.03.2011 |
23.03.2011 |
25.03.2011 1430 hrs |
HWPK/Mech/2011/01 |
Supply &
Fabrication, Welding and Erection of Miscellaneous structures
at HWP (K) Site. |
| 07.03.2011 |
21.03.2011 |
25.03.2011 1500 hrs |
HWB/CIVIL/TAL/11/01 |
Laying sewer lines
at HWP (Talcher) Housing Colony. |
| 07.03.2011 |
14.03.2011 |
15.03.2011 1430 hrs |
HWP
(B)/CIVIL/SITE/2011/4 |
Minor Civil Labour
Works at Heavy Water Plant, Baroda. |
| 04.03.2011 |
14.03.2011 |
15.03.2011 |
HWP(K)/CIVIL/COL/C-3/01/2011 |
Water proofing of roof
terraces with polymer based water proofing treatment for
single storied houses in HWPK housing colony. Phase III. |
| 18.02.2011 |
09.03.2011 |
11.03.2011 |
HWPK/ELECT/MOTOR/02/2011 |
Transportation, rewinding, repair and
testing of various ratings 3-phase, 415 volt induction motors above 164.5 HP but up to 280 HP on rate
contract basis for one year.
|
| 14.02.2011 |
05.03.2011 |
06.03.2011 |
HWP(B)/CIVIL/SITE/2010/22 |
Dismantling work of cooling
tower structure at Heavy Water Plant, Baroda. |
| 25.01.2011 |
15.02.2011 |
03.03.2011 |
HWB/CE(E)/UOF/820/2011/01 |
Design,
engineering, supply, transportation to site, erection,
commissioning of dry type distribution transformers, sandwich
type compact bus duct, HT breaker & capacitor bank and
their inter-connection and also hooking up with existing
system at BARC Facility Kalpakkam, Tamil Naidu. |
| 21.02.2011 |
28.02.2011 |
01.03.2011 |
HWP(K)/CIVIL/P-6/02/2011 |
Uprooting rank vegetation, wild growth and Grass cutting and area
development work at HWP (K) Anushakti for the year 2011. |
| 21.02.2011 |
28.02.2011 |
01.03.2011 |
HWP(K)/CIVIL/P-7/12/2010 |
Day-to-day maintenance of plant buildings at HWP(K) Plant site for
the year 2010-11. |
| 21.02.2011 |
28.02.2011 |
01.03.2011 |
HWP(K)/CIVIL/P-8/04/2011 |
Chain Link Fencing and Pathway for Hewac Security at HWPK. |
| 21.02.2011 |
28.02.2011 |
01.03.2011 |
HWP(K)/CIVIL/P-8/14/2010 |
Miscellaneous civil maintenan-ce work at plant site 2010-2011. |
| 07.02.2011 |
18.02.2011 |
19.02.2011 |
HWPK/Mech/HEWAC/2011 |
Rebabbiting/White metal
deposition of the bearings of N2 Compressor of HEWAC |
| 28.01.2011 |
15.02.2011 |
18.02.2011 |
HWPK/Mech/2011/01 |
Painting of exterior surface
of pipes, tanks, structures, pipe supports & equipments
etc. on annual contract basis at HWPK Site |
| 07.01.2011 |
07.02.2011 |
25.02.2011 |
HWB/CIVIL/TAL/10/04 |
Design, Supply, Construction, Erection, Testing, Commissioning of Sewage Treatment Plant of 400 m3/day capacity at HWP (Talcher) Housing Colony, Vikrampur, Orissa - 759 106. |
| 18.01.2011 |
28.01.2011 |
29.01.2011 |
HWP(K)/CIVIL/P-8/21/2010 |
Day to Day repair and
maintenance work at plant site for 2010-11. |
| 12.01.2011 |
22.01.2011 |
24.01.2011 |
HWPK/ELECT/COLONY/01/2011 |
Maintenance and
replacement of electrical fittings / accessories in street lighting installations, residential quarters
and public buildings at HWP(K) colony, Rawatbhata for one year. |
| 23.12.2010 |
19.01.2011 |
20.01.2011 |
HWPT/INST/223/2010/2 |
Up gradation of Automatic Fire Alarm System (addressable) at Heavy Water Plant (Tuticorin). |
| 08.12.2010 |
05.01.2011 |
06.01.2011 |
HWPT/CIVIL/Colony/12A/2010 |
House keeping of the colony vacant areas and staircase areas of residential blocks at HWP(T) colony for the year 2011-12. |
| 22.11.2010 |
06.12.2010 |
24.12.2010 |
HWB/TKH/2010/SMP/01/77 |
Engineering Services for review of technology for industrial deployment, scale up, design, engineering, fabrication, supply and supervision of erection, commissioning & operation of prototype Sodium metal extraction plant by electrolysis of molten sodium chloride salt in a closed cell, being set up at Heavy Water Plant, Manuguru, A.P |
| 19.11.2010 |
07.12.2010 |
09.12.2010 |
HWPK/MECH/SCAFF/2011/ |
Annual rate contract for Material handling,cleaning of components and Preparation and Removal of scaffoldings for day-to-day maintenance at HWPK site. |
| 19.11.2010 |
14.12.2010 |
16.12.2010 |
HWPK/Mech/2010/SG/1R |
Annual rate contract for Maintenance of Pumps & flange joints, Valve replacements etc. at HWPK site. |
| 10.11.2010 |
09.12.2010 |
10.12.2010 |
HWPK/TSS/SS/2010/01 |
Witnessing The Statutory Testing Of Twenty Three Numbers Of Safety Relief Valves As Per Smpv (U) Rule-18 And Five Number Of H2S Storage Tank As Per Smpv (U) Rule-19 at HWPK Site. |
| 10.11.2010 |
22.11.2010 |
30.11.2010 |
HWB/R&D/LLE/ERECTION/
10/10 |
Unloading & loading at DPS project stores, transporting to TDP, RCF Chembur, unloading at TDP site and erection of ARDC unit along with its auxiliary equipments, SS piping, valves and MS Structures including supply and erection of HDPE Tanks & CD4MCU Pumps; supply, fabrication and erection of HDPE Pipes, valves, fittings along with MS structural supports for piping. |
| 01.11.2010 |
16.11.2010 |
03.12.2010 |
HWB/UNCF/K/01 |
Engineering, procurement, construction (EPC) of system consisting of Paddle dryer, Calciner, scrubbers, various vessels, weighing & drumming systems along with the associated piping, electrical and instrumentation, commissioning and performance testing at Kalpakkam, Tamil Nadu. |
| 03.11.2010 |
18.11.2010 |
19.11.2010 |
HWPK/I&C/2010/ |
COMPREHENSIVE ANUAL MAINTENANCE CONTRACT FOR TATA MAKE TELEPHONE EXCHANGE MODEL IDX-1250 WITH BUILT IN CAPACITY OF 450 LINES INCLUDING TIE LINES. |
| 05.10.2010 |
10.11.2010 |
12.11.2010 |
HWPK/PROD/2/2010 |
Operation work of Shifting of cylinders, cooling tower cells' cleaning, chemical dissolution & drums handling, sodium sulphide dissolution, digging and shifting of sodium sulphate (Glauber salt) in tanks and Cleaning of Neutralisation pit in WTP. |
| 22.10.2010 |
27.10.2010 |
28.10.2010 |
HWP(K)/CIVIL/P-8/15/2010 |
Development near Solar System and Sewage Treatment Plant Area at the West Side of Exchange Unit. |
| 08.10.2010 |
27.10.2010 |
28.10.2010 |
HWP/CIVIL/PLANT/12/2010 |
Civil works for utilities of Solvent
Synthesis Pilot plant at HWP(Tuticorin). |
| 08.10.2010 |
27.10.2010 |
28.10.2010 |
HWP/CIVIL/PLANT/13/2010 |
Cold well partition and pathway works
at HWP(Tuticorin). |
| 22.10.2010 |
23.11.2010 |
25.10.2010 |
HWPK/Mech/2010/SG-2 |
Fabrication of new Knock Out Drum & replacement of corroded Knock
Out Drum with new fabricated Knock Out Drum at HWPK site. |
| 05.10.2010 |
21.10.2010 |
22.10.2010 |
HWB/CE(E)/220/2010/01 |
Annual
Comprehensive Maintenance and Servicing Contract of 116 Nos. of Window/Split airconditioners
of Fedders Lloyd/LG/Blue Star/ Carrier make (1.0 Tr.,1.5 Tr. and 2.0 Tr.
Capacity) installed at Heavy Water Board (Central Office), V.S Bhavan,
Anushakti-nagar, Mumbai-400 094. |
| 29.09.2010 |
26.10.2010 |
23.10.2010 |
HWPM/E-P/NIT/Wac-Wc/ 2010 |
Annual maintenance of window a/cs, water coolers, bottle coolers and DU package a/cs. |
| 24.09.2010 |
11.10.2010 |
15.10.2010 |
HWPK/PROD/1/2010 |
Operation and routine mainte- nance of sewage treatment plant...... will report to HWPK staff for any deficiencies. |
| 27.08.2010 |
06.10.2010 |
07.10.2010 |
HWPT/INST/223/2010/1 |
Up gradation of Automatic Fire Alarm System (addressable) at Heavy Water Plant (Tuticorin). |
| 27.08.2010 |
06.10.2010 |
07.10.2010 |
HWPT/INST/221/1 |
Electrical Works for Solvent Synthesis Pilot Plant at HWP(T). |
| 24.09.2010 |
28.09.2010 |
29.09.2010 |
HWP(K)/CIVIL/P-3/11/
2010 |
Miscellaneous painting Jobs at plant building in patch work at Anushakti in the year 2010-11. |
| 27.08.2010 |
29.09.2010 |
30.09.2010 |
HWPT/CIVIL/Colony/
12/2010 |
House Keeping of the vacant areas and staircase areas of residential blocks at HWP(T) colony for the year 2010-11. |
| 31.08.2010 |
06.09.2010 |
07.09.2010 |
HWPK/TT/PCAMC/2010/01-A |
ANNUAL MAINTENANCE CONTRACT FOR SERVICING/ MAINTENANCE OF COMPUTER SYSTEMS ALONGWITH PERIPHERALS INSTALLED AT HWP(K). |
| 27.08.2010 |
15.09.2010 |
16.09.2010 |
HWPT/MECH/639 |
Design, Supply, fabrication,
inspection, testing, erection
and commissioning of
PP(FRP) Vent scrubber for
Solvent Synthesis Pilot Plant
at HWP, Tuticorin. |
| 13.08.2010 |
27.08.2010 |
17.09.2010 |
HWB/MECH/SA/2010 |
Solution Annealing of Service Aged Inconel 625 Stub Ends and Machining of the same. |
| 05.08.2010 |
30.08.2010 |
31.08.2010 |
HWPK/I&C/2010/ |
Comprehensive anual mainten- ance contract for tata make telephone exchange model IDX-1250 with built in capacity of 450 lines including tie lines. |
| 04.08.2010 |
13.09.2010 |
14.09.2010 |
HWPM/TS/DRY ASH/2010 /01 |
Operation and maintenance of Dry Fly Ash Collection, Segregation & Storage System Including Evacuation of Dry Fly Ash from silos and transportation for end use. |
| 13.08.2010 |
21.08.2010 |
21.08.2010 |
HWPK/ADMN/TC/21/2010 |
Supply and plying of one new Ambulance on TATA Sumo chasis (Company built) for a period of two years on contract basis to HWP(K). |
| 22.07.2010 |
03.08.2010 |
05.08.2010 |
HWPK/Mech/CT/SS Grid/ 2010 |
Fabrication and supply of SS Grids for Cooling Tower at HWP (Kota). |
| 20.07.2010 |
02.08.2010 |
04.08.2010 |
HWPK/Mech/PPGL-piping/ 2010/ |
Supply, fabrication and erection of 2" NB PPGL pipe for acid tanks & 6" NB HDPE Heavy duty piping for Neutralising pit in WTP at HWP (K) Plant Site. |
| 06.07.2010 |
02.08.2010 |
24.07.2010 |
HWPM/M-P/FAB/27/2010 |
Laying of additional LP line from H2S plant North West corner to VAR plant at main plant of HWP(M). |
| 22.06.2010 |
19.07.2010 |
21.07.2010 |
HWPK/Mech/CT/2010 |
"Supply,removal & erection of structural members, eliminators with associated parts, louvers and other components of Cooling Tower at HWP (K)." |
| 15.07.2010 |
16.07.2010 |
16.07.2010 |
HWPK/ADMN/TC/21/2010 |
Supply and plying of one new Ambulance on TATA Sumo chasis (Conpany built) for a period of two years on contract basis to HWP (K). |
| 06.07.2010 |
02.07.2010 |
03.07.2010 |
HWPK/Mech/CT Cell 3/2010 |
Repair of Cooling Tower cell no 3 of process cooling tower Model 664-4-05 at HWP (Kota). |
| 03.06.2010 |
06.07.2010 |
08.07.2010 |
HWP/CIVIL/PLANT/08/2010 |
Civil and structural works for solvent synthesis facility at HWP (Tuticorin). |
| 26.05.2010 |
03.07.2010 |
28.06.2010 |
HWPM/M-P/CT/28/2009 |
Revamping of Main Cooling tower cells in Main Plant of HWP (M) in Two phases (During winter season of 2010 & Before 1st, March, 2011) including supply of required material. |
| 25.05.2010 |
18.06.2010 |
24.06.2010 |
HWB/CIVIL/CO/10/01 |
Fabrication & Erection of work stations and storage units
in the existing Accounts Wing at 0 floor, Hindi section at 4th floor, South wing, V.S. Bhavan, Anushaktinagar, Mumbai – 400 094. |
| 07.06.2010 |
22.06.2010 |
24.06.2010 |
HWPK/Mech/ADS/2010 |
Adsorbent filling and associated work of structural modification, flange opening,filling of adsorbent, re-fixing of flanges etc. in HEWAC at HWPK site. |
| 04.06.2010 |
21.06.2010 |
22.06.2010 |
HWPK/I&C/2010/ |
COMPREHENSIVE ANUAL MAINTENANCE CONTRACT FOR TATA MAKE TELEPHONE EXCHANGE MODEL IDX-1250 WITH BUILT IN CAPACITY OF 450 LINES INCLUDING TIE LINES. |
| 23.04.2010 |
04.06.2010 |
07.06.2010 |
HWB/AS-13/2010/01 |
Revamping of 04 nos of ESP fields in CPP of HWP(Manuguru). |
| 24.05.2010 |
31.05.2010 |
01.06.2010 |
HWPK/TT/PCAMC/2010/01 |
Anuual maintenance contract for servicing/maintenance of computer systems alongwith peripherals installed at HWP(K). |
| 14.05.2010 |
04.06.2010 |
01.06.2010 |
HWB/RMR/H/002 |
Engineering Services Consultan-cy for Basic Engineering, Preparation of Design Basis Reports (DBRs) & Detailed Project Report (DPR) for RMR Plant Haldia. |
| 22.04.2010 |
26.04.2010 |
27.04.2010 |
HWP/B/S/6000/2010/ SECURITY/1 |
HIRING OF
SECURITY PERSONNEL FOR THE HOUSING COLONIES
AT NIZAMPURA AND DANTES-HWAR AT HWP (BARODA). |
| 22.04.2010 |
11.05.2010 |
12.05.2010 |
HWP(K)/CIVIL/P-7/09/2010 |
Day to Day maintenance of Industrial open AREA, Roads, Drains etc. in HWPK (K) at Anushakti for the year 2010-2011. |
| 22.03.2010 |
12.04.2010 |
14.04.2010 |
HWPK/Mech/Piping/2010-02 |
Annual item rate contract for fabrication, welding & erection of pipe lines & Misc. welding jobs at HWP(K)" at Heavy Water Plant (Kota) site , Anushakti - 323 303. |
| 22.03.2010 |
06.04.2010 |
07.04.2010 |
HWP(K)/CIVIL/C-2/11/ 2010 |
Up Keeping and miscellaneous work in HWPK Housing colony for the year 2010-2011. |
| 22.03.2010 |
06.04.2010 |
07.04.2010 |
HWP(K)/CIVIL/C-4/12/ 2010 |
Providing External & Internal surface paint and enamel paints for door, windows ventilators and cupboards of single storied houses at HWPK housing colony. Phase-II. |
| 22.03.2010 |
06.04.2010 |
07.04.2010 |
HWP(K)/CIVIL/P-02/06/ 2010 |
Refurnishing of Central Control Room and other control room at WTP,liquid Nitrogen Plant & CAP etc. |
| 22.03.2010 |
06.04.2010 |
07.04.2010 |
HWP(K)/CIVIL/P-7/07/2010 |
Day-to-Day maintenance of plant buildings at Heavy Water Plant (Kota) at HWP(K) Plant site for the year 2010-11. |
| 11.03.2010 |
24.03.2010 |
25.03.2010 |
HWPK/MECH/RL/2009-10-A |
Rubber lining work on already fabricated pipe spools, flanges, Nozzles & Equipments etc. at HWP (K) Plant Site. |
| 11.03.2010 |
22.03.2010 |
23.03.2010 |
HWP(K)/CIVIL/C-03/09/ 2010 |
Bitumen based water proofing phase II. |
| 11.03.2010 |
22.03.2010 |
23.03.2010 |
HWP(K)/CIVIL/C-06/03/ 2010 (II nd call) |
Annual maintenance of lawns & gardens and planting if trees in HWPK housing colony for the year 2010-2011. |
| 11.03.2010 |
22.03.2010 |
23.03.2010 |
HWP(K)/CIVIL/C-05/01/ 2010 (II nd call) |
Carpentry, Plumbing, Masonry, Welding and Store Handling Jobs at HWPK Housing Colony. |
| 11.03.2010 |
22.03.2010 |
23.03.2010 |
HWP(K)/CIVIL/P-06/05/ 2010 |
Annual maintenance of lawns and gardens at HWPK Anushakti for the year 2010-2011. |
| 26.02.2010 |
19.03.2010 |
22.03.2010 |
HWP/B/S/6620/2010/
TRANSPORT/1 |
HIRING OF MINI BUSES OF MODEL 2007- 08 WITH 25 SEAT CAPACITY FOR COMMUTING EMPLOYEES OF HWP(BAR0DA). |
| 26.02.2010 |
16.03.2010 |
17.03.2010 |
HWPK/MECH/SCAFF/2010 |
Annual Rate of contract for Material handling,cleaning of components and Preparation and Removal of scaffoldings for day-to-day maintenance at HWPK site. |
| 24.02.2010 |
09.03.2010 |
10.03.2010 |
HWPM/DGM(P)/I-P/COMP/ 30001/1 |
Maintenance Contract for
Computers & Printers. |
| 06.01.2010 |
05.02.2010 |
26.02.2010 |
HWB/CIVIL/TAL/09/07 |
Design, Supply, Construction, Erection, Testing, Commission- ing of Sewage Treatment Plant of 300 m3/day capacity and sewage system at HWP (Talcher) Housing Colony, Vikrampur, Orissa - 759 106. |
| 10.02.2010 |
22.02.2010 |
25.02.2010 |
HWPK/Mech-ISI/2010-01 |
Handling of sophisticated
IS1 Equipments and preparation of jobs in fiel |
| 28.01.2010 |
16.02.2010 |
25.02.2010 |
HWP/TAL/MECH/2009/17 |
Fabrication,erection,welding and testing of KB4 utility piping and fire water sprinkler system work at HWP TALCHER. |
| 10.02.2010 |
16.02.2010. |
17.02.2010 |
HWP(K)/CIVIL/C-01/06 /2010 |
Construction of water bound macadam road at Eastern side of
E-Road at HWP(K) Housing Colony. |
| 10.02.2010 |
16.02..2010. |
17.02.2010 |
HWP(K)/CIVIL/C-05/08 /2010 |
Miscellaneous Civil Maintenance / Renovation Work At
HWP(KP Housing Colony for the year 2010-2011. |
| 10.02.2010 |
16.02..2010. |
17.02.2010 |
HWP(K)/CIVIL/P-8/ 01 /2010 |
Construction of watch tower and repair of property wall at
HWPK, Anushakti. |
| 05.02.2010 |
20.02.2010 |
22.02.2010 |
HWPK/TT/MONUPG/ 2010/01 |
Upgradation of 15" CRT Colour Monitors to 18.5" TFT
Colour Monitors. |
| 29.01.2010 |
05.02.2010 |
10.02.2010 |
HWPM/M-P/102/MTA-2010/27 - 28 |
Ultrasonic Flaw Detection (UFD) & Liquid penetrant test (LPT) of weld joints of equipments & piping covered under ISI jobs at HWP (M) site during MTA-2010
OR
Eddy Current Testing of Shell & Tube type Heat Exchangers |
| 06.01.2010 |
13.01.2010 |
15.01.2010 |
HWP(K)/CIVIL/C-06/03/ 2010 |
Annual maintenance of lawns & gardens and planting it trees in HWPK housing colony for the year 2010-2011. |
| 31.12.2009 |
13.01.2010 |
15.01.2010 |
HWPK/CIVIL/C-05/01/2010 |
Carpentry, Plumbing, Masonry, Welding and Store Handling Jobs at HWPK Housing Colony. |
| 31.12.2009 |
13.01.2010 |
15.01.2010 |
HWPK/CIVIL/C-4/02/2010 |
Conversion of Type VIII Single Storied Houses (34 no.) to Type VI Houses (17 no.) at HWPK Housing Colony. |
| 07.12.09 |
26.12.09 |
29.12.09 |
HWPW/Mech/RBAT/2009/ |
Rebabbiting/White metal
deposition of the bearings and Stuffing Box Throat Bush of compressors of HEWAC. |
| 20.11.09 |
30.11.09 |
01.12.09 |
HWPK/CIVIL/P-4 /21/ 2009 (Second call) |
Construction of two No of foundatio- ns for new HCL tanks in WTP area. |
| 17.11.09 |
30.11.09 |
26.11.09 |
HWPM/IP/MTA-2010/01 |
CORRIGENDUM - Maintenance of air motor operated pneumatic actuators. |
| 11.11.09 |
23.11.09 |
25.11.09 |
HWPK/SAFETY/2009/01 |
Annual Contract for handling and maintenance of various safety appliances in round the clock shift and general shift at Heavy Water Plant (Kota),Anushakti 323 303. |
| 30.10.09 |
18.11.09 |
20.11.09 |
HWPK/PROD/5/2009 |
Operation work of shifting of cylinders, cooling tower cells' cleaning, chemical
dissolution & drums handling,sodium sulphide dissolution,dogging and shifting of sodium sulphate (Glauber salt) in tanks)
and Cleaning of Neutralisation pit in WTP" at Heavy Water Plant (Kota),Anushakti 323 303. |
| 30.10.09 |
19.11.09 |
21.11.09 |
HWPK/PROD/6/2009 |
Operation and routine maintenance of sewage treatment plant at Heavy Water Plant (Kota),Anushakti 323 303. |
| 23.10.09 |
06.11.09 |
25.11.09 |
HWB/UNCF/K/01 |
CORRIGENDUM - Engineering, procurement, construction (EPC) involving civil, process, mechanical, electrical and instrumentation work complete project management and execution, consisting of plant building, complete civil works and chimney, supply and erection of UNPS storage tanks, various equipment and vessels along with the associated piping, electrical and instrumentation, various package units, auxiliary systems and erection of free issue material, commissioning and performance testing of the complete plant, at Kalpakkam, Tamil Nadu. |
| 23.10.09 |
26.11.09 |
27.11.09 |
HWPK/TSS/SS/2009/01 |
Witnessing the statutory testing of Safety Relief valves. |
| 17.09.09 |
28.10.09 |
25.11.09 |
HWB/UNCF/K/01 |
Engineering, procurement, construction (EPC) involving civil, process, mechanical, electrical and instrumentation work complete project management and execution, consisting of plant building, complete civil works and chimney, supply and erection of UNPS storage tanks, various equipment and vessels along with the associated piping, electrical and instrumentation, various package units, auxiliary systems and erection of free issue material, commissioning and performance testing of the complete plant, at Kalpakkam, Tamil Nadu. |
| 14.10.09 |
09.11.09 |
12.11.09 |
HWPK/Mech-ISI/2009-06 |
In situ Metallographic testing (Replica work) & hardness measurement at selected manhole
coves of towers, tanks & selected pipe lines during ATA-2009 at Heavy Water Plant (Kota)", Anushakti 323 303. |
| 06.10.09 |
02.11.09 |
11.11.09 |
HWPM/M-P/MTA-2010/B |
Removal of Existing Hot insulation,
Supply & application of Hot
insulat- ion on Piping, Heat
Exchangers, vessels at Main Plant
of HWP (M) (Including painting) |
| 01.10.09 |
13.10.09 |
15.11.09 |
HWPK/MECH/FRP/2009 |
Annual Rate contract for FRP repair jobs on pipe spools, flanges , Nozzles & Equipments etc. at HWP (K) Plant Site. |
| 27.10.09 |
05.11.09 |
06.11.09 |
HWPK/CIVIL/P-4/21/2009 |
Construction of two No of foundations for new HCL tanks In WTP area. |
| 27.10.09 |
05.11.09 |
06.11.09 |
HWPK/CIVIL/P-4/ 11/ 2009 |
Providing and fixing PPG lining in Neutralisation Pit and other locations at HWPK. |
| 01.10.09 |
28.10.09 |
04.11.09 |
HWPM/M-P/FAB/18/2009 |
Fabrication and Supply of XU Gas boosters Suction & Discharge spool Pieces. |
| 08.10.09 |
20.10.09 |
21.10.09 |
HWP(K)/CIVIL/C-5/ 19/ 2009 |
Annual Pest and Mosquito control at HWPK housing colony at Rawatbhata for the year 2009-2010. |
| 08.10.09 |
20.10.09 |
21.10.09 |
HWP(K)/CIVIL/P-4/ 13/ 2009 |
SPECIAL REPAIRS IN MAIN/ETP COOLING TOWER AND OPEN DRAIN IN WTP AREA DURING MTA 2009 AT HWPK. |
| 08.10.09 |
20.10.09 |
21.10.09 |
HWP(K)/CIVIL/P-8/ 17/ 2009 |
Miscellaneous civil maintenance works at plant Site for the year 2009-2010. |
| 08.10.09 |
20.10.09 |
21.10.09 |
HWP(K)/CIVIL/P-4/ 18/ 2009 |
MISCELLENEOUS SPECIAL REPAIRS IN ACID STORAGE AREA IN WTP AREA DURING MTA 2009. |
| 17.09.09 |
01.10.09 |
14.10.09 |
HWPM/M-P/MTA-2010/A |
Heat Exchanger Maintenance |
| 15.09.09 |
13.10.09 |
14.10.09 |
HWPM/E-P/NIT/Wac-Wc/ 2009/ |
Annual Maintenance of Window A/Cs,Split A/c's.Water Coolers,Bottle
Coolers and DU Package A/Cs. |
| 29.07.09 |
31.08.09 |
30.09.09 |
HWB/RPTD/EPC–H2O/ 04/09 |
Design, residual engineering, fabrication / procurement, inspection & testing at manufacurer works , transportation to site, loading & unloading, erection, testing, pre-commissioning & commissioning for hydrogen oxidation system to be set-up at HWP, Kota. |
| 11.09.09 |
23.09.09 |
25.09.09 |
HWPK/Mech-ISI/2009-05 |
In situ
Metallographic testing (Replica work) & hardness mesaurement at selected man hole covers of towers, tanks & selected pipe
lines during ATA - 2009 at Heavy Water Plant (Kota)" from Contractors of reputeand having sufficient experience for similar
type of works. |
| 24.08.09 |
22.09.09 |
25.09.09 |
HWPK/Mech/2009/ |
"Design,supply,erection,commissi- oning of Load cell for TATA P & H crane at HWPK site" Anushakti 323
303. |
| 10.09.09 |
17.09.09 |
18.09.09 |
HWPK/CIVIL/P-2/14/2009 |
False flooring system in DCS control room. |
| 07.09.09 |
17.09.09 |
19.09.09 |
HWPK/Mech/Piping/ 2009/04 |
Separation of De-aerator & storage tanks weighing approx 8 MT & 20 MT respectively,lowering from 11.5 meter high Steam Generation Plant to ground floor by Derrick/crane; their shifting and erection on new foundation at ground floor with help of crane & trailer including Fabrication, welding & erection of pipelines from new location of tanks to 31 V1 & 32 V1 at HWPK site at Heavy Water Plant (Kota) site,Anushakti 323 303. |
| 07.09.09 |
12.09.09 |
15.09.09 |
HWPK/Mech/OLS/2009/ |
Annual rate contract for on line sealing jobs of steam leakages at HWPK site. |
| 07.09.09 |
15.09.09 |
17.09.09 |
HWPK/Mech/RL/2009-10/ |
Rubber lining work on already fabricated pipe spools, flanges, Nozzles & Equipments etc.at HWP (K) Plant Site. |
| 07.09.09 |
12.09.09 |
15.09.09 |
HWPK/Mech/OLS/2009/ |
Annual rate contract for on line sealing jobs of steam leakages at HWPK site. |
| 19.06.09 |
07.08.09 |
14.09.09 |
HWB/RMP/H/001 |
Engineering Consultancy & Project Management for RMP (Haldia). |
| 01.09.09 |
11.09.09 |
14.09.09 |
HWP(K)/CIVIL/P-9/12/ 2009 |
Construction Of Air Washer System For HEWAC
Facility in Ventilation Building at HWP(K). |
| 01.09.09 |
11.09.09 |
14.09.09 |
HWP(K)/Civil/ C-3/07/ 2009 |
Water proofing to roof terrace with polymer based water proofing membrane. |
| 01.09.09 |
11.09.09 |
14.09.09 |
HWP(K)/CIVIL/P-9/ 03/ 2009 |
Construction of Additional Product Storage Building. |
| 01.09.09 |
11.09.09 |
14.09.09 |
HWPK/CIVIL/P-4 /11/2009 |
Providing and fixing PPG lining in Neutralisation Pit and other
locations at HWPK. |
| 30.07.09 |
01.09.09 |
02.09.09 |
HWP(M)/E-P/NIT/33kv cable/2009 |
Replacement of 33 KV,3CX240 sqmm,Cable of KCR Feeders (KCR - 2,3,5,6 & 8). |
| 18.08.09 |
01.09.09 |
03.09.09 |
HWPT/Admn/TPT/1/2009 |
CORRIGENDUM - Providing Mini Bus (25 Seater) for transportation of HWPT employees from Tuticorin town to HWP Plant site via HWP Housing
colony and back. |
| 11.08.09 |
19.08.09 |
20.08.09 |
HWPT/Admn/TPT/1/2009 |
Providing Mini Bus (25 Seater) for transportation of HWPT employees from Tuticorin town to HWP Plant site via HWP Housing
colony and back. |
| 08.07.09 |
01.08.09 |
03.08.09 |
HWPT/CIVIL/Colony/ 09/2009 |
House Keeping of the vacant areas and staircase areas of residential blocks at HWP(T) colony for the year 2009-10. |
| 08.07.09 |
27.07.09 |
31.07.09 |
HWPK/Mech-ISI/ATA-2009/03 |
"Ultrasonic Flaw Detection (UFD) & Liquid Penetrant Testing (LPT) of weld joints of equipments & piping covered under In Service Inspection jobs at HWPK site during Annual Turn Around-2009." |
| 21.05.09 |
30.06.09 |
02.07.09 |
HWPK/PROD/DISPOSAL /1/2009 |
Amendment - SALE OF SODIUM SULPHATE (GLAUBER SALT),ON AS IS WHERE IS BASIS, APPR- OXIMATE
QUANTITY-800 MT. |
| 18.05.09 |
12.06.09 |
25.06.09 |
HWB/CIVIL/M/09/01 |
Construction of RPUM Office, Guest House & 6 nos Type II (B) houses including internal and external PH works & electrical works in NFC premises at Hyderabad. |
| 04.06.09 |
18.06.09 |
19.06.09 |
HWPK/I&C/2009/ |
Comprehensive annual maintenance contract for tata make telephone exchange model idx – 1250 with buitl in capacity of 450 lines including tie lines. |
| 29.05.09 |
20.06.09 |
23.06.09 |
HWPK/Mech/Piping/ 2009/02 |
Servicing & Painting of Spring Hanger Supports of XU towers & rigid supports during ATA-09 at HWPK site. |
| 11.05.09 |
09.06.09 |
22.06.09 |
HWB/CIVIL/TAL/09/05 |
Design, Supply, Construction, Erection, Testing, Commissioning of Sewage Treatment Plant of 300 m3/day capacity and sewage system at HWP (Talcher) Housing Colony, Vikram Nagar, Orissa - 759 106. |
| 29.05.09 |
10.06.09 |
12.06.09 |
HWPK/Mech/2009/SG-3 |
Fabrication of new bottom dish end for HP seal pot & replacem- ent of corroded bottom dish end of HP seal pot with new fabricated dish end at HWPK site |
| 21.05.09 |
08.06.09 |
11.06.09 |
HWPT/CIVIL/09 |
Civil works for a dynamic Solvent extraction test set up for Hemi Hydrate Acid at HWP(T). |
| 21.05.09 |
08.06.09 |
11.06.09 |
HWPT/MECH/612 |
Supply,erection and commissioning of mechanical packages for a dynamic Solvent extraction test set up
for Hemi-Hydrate Acid at HWP(T). |
| 21.05.09 |
08.06.09 |
11.06.09 |
HWPT/INST/212/1 |
Electrical Works for Dynamic
SX Test Set-up of Hemihydrate Acid at HWP(T). |
| 21.05.09 |
08.06.09 |
11.06.09 |
HWPT/INST/210/1 |
Design,Detailed Engineering, Fabrication/ Manufacturing, inspection,testing and Commiss- ioning of 415 Volt Motor Control Centre at HWP(T) |
| 11.05.09 |
01.06.09 |
02.06.09 |
HWPK/TT/PCAMC/ 2009/01 |
"Annual maintenance contract for servicing / maintenance of pc (computer) systems alongwith peripherals installed at HWP (k)" |
| 06.05.09 |
30.05.09 |
04.06.09 |
4470/HWPT/INST/ 211/2009/1 |
“Design, Detailed Engineering, Fabrication/
Manufacturing, inspection, testing and Commissioning of Variable Frequency Drive (VFD)
system for AC induction Motors” |
| 29.04.09 |
29.05.09 |
29.05.09 |
HWPM/2009/ DRY FLY ASH /01 |
"Lifting of dry fly ash from Heavy Water Plant(Manuguru) for delivery to the users like cement Industries, Brick Manufacturers, Low lying area filling etc" |
| 21.05.09 |
26.05.09 |
27.05.09 |
HWPM/DGM(P)/I-P/Tele cable/2009/1154 |
Telephone cable laying for New D-type flats |
| 23.04.09 |
14.05.09 |
16.05.09 |
HWPK/Mech/NK/2009-01 |
"Fabrication, welding & erection of pipelines for buried drain header replacement at
HWPK site)". |
| 17.04.09 |
06.05.09 |
08.05.09 |
HWPK/Mech/2009/SG-2 |
"Rebabbiting/white metal deposition on journal bearing of H2S gas Centrifugal Compressor (H2S gas boosters)". |
| 21.03.09 |
27.04.09 |
30.04.09 |
HWPK/Mech-ISI/ ATA-2009/02 |
"Eddy Current Testing of Shell & Tube type of Heat Exchangers at HWPK site during Annual Turn Around-2009." |
| 21.03.09 |
21.04.09 |
25.04.09 |
HWPK/Mech-ISI/ ATA-2009/01 |
"Ultrasonic Flaw Detection (UFD) & Liquid Penetrant Testing (LPT) of weld joints of equipments & piping covered under In Service Inspection jobs at HWPK site during Annual Turn Around-2009." |
| 02.04.09 |
20.04.09 |
22.04.09 |
HWPK/Mech/Piping/ 2009-01 |
"Item rate contract for fabrication, welding,erection of pipeline and miscellaneous welding jobs at HWPK site". |
| 13.03.09 |
18.04.09 |
21.04.09 |
HWPK/Mech/ATA-09/ MG-06 |
"Material handling, cleaning of components and Preparation and Removal of scaffoldings during ATA-09 at HWPK site" Anushakti 323 303. |
| 13.03.09 |
13.04.09 |
15.04.09 |
HWPK/Mech/DD Valve/ ATA-09/Part-I |
DD valve removal from pipe line,shifting to maintenance bay, re-installation of valve with its pneumatic actuator etc, Maintenance of flange joints, repairs of flange faces by welding and rectification for successful testing at HWP(K). |
| 13.03.09 |
15.04.09 |
17.04.09 |
HWPK/Mech/DD Valve/ ATA-09/Part-II |
Maintenance and testing of Small size DD valves sizes ranging from 2" NB-6" NB at HWP (K). |
| 13.03.09 |
15.04.09 |
17.04.09 |
HWPK/Mech/DD Valve/ ATA-09/Part-III |
Maintenance and testing of Large size DD valves covering sizes ranging from 8" NB-36" NB at HWP (K). |
| 12.03.09 |
02.04.09 |
04.04.09 |
HWPK/Mech/Scaff/2009 |
"Annual
Rate contract for Material handling, cleaning of components and Preparation and Removal of scaffoldings for day-to-day maintenance at HWPK site" Anushakti 323 303. |
| 05.03.09 |
25.03.09 |
08.04.09 |
HWP/B/S/PROD/09-10/01 |
ANNUAL MAINTENANCE CONTRACT FOR HOT AND COLD INSULATION ON PIPE & EQUIPMENT. |
| 04.03.09 |
01.04.09 |
03.04.09 |
HWPK/Mech/ATA-09/ MG-05 |
"Removal,Maintenance, Testing & Re-installation of Gate, Globe, Check, Plug valves, Ball valve at HWPK site during ATA-09" Anushakti 323 303. |
| 26.02.09 |
06.04.09 |
09.04.09 |
HWPK/I&C/2009/ |
"Design, Engineering,
Estimation Supply, Installation, Testing, Commissioning and Guaranty of CCTV System and Access Control System at new facility of HEWAC at HWPK site." |
| 17.02.09 |
30.03.09 |
03.04.09 |
HWPK/I&C/2009/T-1 |
"Servicing & Testing of Control Valves of HWP(K) during annual Turn Around Scheduled in August - September 2009 at HWPK Site" |
| 23.02.09 |
20.03.09 |
23.03.09 |
HWPK/MECH/MTA-09 |
"Removal, Handling, Servicing & Reinstallation of Safety Relief Valves at HWPK site", Anushakti, 323 303. |
| 18.02.09 |
16.03.09 |
18.03.09 |
HWPK/INST/T-2/08-09 |
"Servicing of Limitorque Actuators & 1/2" SS gate valves (Audco make) at HWPK", Anushakti-323 303. |
| 13.02.09 |
13.03.09 |
16.03.09 |
HWPK/INST/WTP/ TEND/2008-09/T4 |
Servicing and maintenance of Saunder's Valves and Actuators of Water Treatment Plant at HWPK during Major Turn Around scheduled in July/August-2009 |
| 04.02.09 |
21.02.09 |
25.02.09 |
8000K/HWP/B/KP/08-09/01 |
REVAMPING OF POTASSIUM METAL PLANT FURNACE CHAMBERS |
| 04.02.09 |
13.02.09 |
23.02.09 |
HWB/CIVIL/M/09/02 |
Construction of 30 Nos. type E houses, 50 Nos. Efficiency Apartments and external services for type E houses in HWP Housing Colony of HWP (Manuguru) at Aswapuram, Dist. Khammam, Andhra Pradesh. |
| 20.01.09 |
16.02.09 |
17.02.09 |
HWPK/PCUPG/TS/2008/01 |
"UP-GRADATION OF PENTIUM-III BASED COMPUTERS & RAM AT HWP-KOTA" at Heavy Water Plant (Kota),Anushakti - 323 303. |
| 12.11.08 |
25.12.08 |
20.01.09 |
HWB/RPTD/KBF4 - Tal/EPC/6/08
|
Design, detailed engineering, fabrication / procurement, inspection and testing at manufacturer works, transportat- ion to site, loading & unloading, erection, precommissioning & testing and commissioning assist- ance for Conversion of BF3 - diethyl ether complex to Potassium flouro-borate (KBF4) to be set-up at HWP,Talcher. |
| 27.11.08 |
18.12.08 |
05.01.09 |
HWP(M)/COL/ELECT/ 2008/05 |
External Electrification of (153Nos type D, 30Nos type E and 50Nos Efficiency apartments) 233 Nos New residential quarters including
installations new load center Substation in HWP (M) Colony. |